How to Calculate Cement Bags:
Step by
step instructions to Ascertain Concrete sacks:
Moves
toward Ascertain Concrete Sacks (Cement Bags) In 1 Cubic Meter:
Allow
us to expect the blend concrete is M20 i.e.1:1.5:3
Loss of
concrete is viewed as 2%
The
result of blend is thought of as 67%
To
accomplish 1 cum yield, we really want 1/0.67 = 1.49 say 1.50 cum dry blend.
Presently
add the wastage of 2%, i.e (1.50 + 0.02) = 1.52 cum.
Volume
of concrete = (concrete/cement+sand+aggregate) × Absolute material
=(1/1+1.5+3)
× 1.52
=0.276
cum
As we
probably are aware, the thickness of concrete is 1440 kg/cum and
Weight
of 1 pack concrete = 50 kg.
Subsequently
volume of 1 sack concrete = 50/1440
=0.0347 cum.
∴ No. of concrete packs expected in 1 cubic meter =
0.276/0.0347
= 7.95 packs or 8 sacks
Note:
You can involve similar equation for ascertaining concrete for other ostensible
blends.
The
most effective method to Work out Number of Blocks in a Wall
Computation or Calculation of Blocks in a Wall:
Assessment
of building materials is expected prior to beginning another development
project. Today we will examine how to compute number of blocks in a wall. This
is a manual block mini-computer that will assist you with working out no. of
blocks for your task.
Block
Adding machine in Decimal standard for measuring:
For
computing the quantity of blocks, the thickness of mortar ought to be deducted
from the thickness of the block brick work wall. For instance, for a standard
block facade (With load-bearing segments) of 9 inches or 230 mm thick, the
genuine thickness without mortar would be 200mm, for example one block thick.
To
utilize the block number cruncher physically we want a few information for
computing no. of blocks.
1.
Volume of the wall.
2.
Volume of a standard block.
3.
Subtleties of openings in the wall.
How
about we accept
Length
of the wall = L= 5 mtr
Level
of the wall = h = 3 mtr
Width of the wall = B = 200 mm = 0.2 mtr
Expecting
that the wall has no openings.
Block
size = 190 mmx 90 mm x 90 mm (without mortar)
Volume
of block brick work in wall = lxhxb = 5 x 3 x 0.2 = 3 m3
Volume
of one block with mortar = 0.2 x 0.1 x 0.1 = 0.002 m3
Number
of blocks = [Volume of block workmanship/volume of one brick]
= 3/0.002 = 1500 blocks.
Think
about 5% wastages of blocks.
Accordingly,
number of blocks expected for 1 cubic meter = 1/3*500
=500